Facebook icons twitter icon Register | Login

Career Networking for the Built Environment
Resumes | Employers | Jobs | Answers

 

 

Details of Hardik


Hardik

Assistant Project Manager

Raleigh, United States
Industry Category: Construction Recruiters
Personal Website Link:: http://
Video URL Link: http://

Hardik'S Overview

Resume:

EDUCATION  

NCState University, Raleigh, NC   GPA: 3.51/4.00      
Masters of Science in Civil engineering with ConstructionEngineering and Management Major

Nirma University, Ahmedabad,India       GPA: 7.28/10.00    Bachelor of Technology in CivilEngineering               

TECHNICAL SKILLS
Team Building and Leadership
Construction Planning and Scheduling
Critical Path Project Management
Budget Analysis
Safety and Compliance Management
Cost Estimating

COMPUTER SKILLS
Smart sheet and MS Project
B
asic knowledge of Primavera, Timberline, BIM
AutoCAD
Stroboscope and EZStrobe
STAAD Pro
Microsoft Office


 

WORK EXPERIENCE

Assistant ProjectManager (Intern), Five Horizons Construction & Development, Dec 2011 Present
        Planning and scheduling of residentialdevelopment, renovation and house relocation related projects
        
Identifying and surveying potential sites andquantifying plans and specifications with the aid of architect
        
Obtaining the necessary permits required forthe completion of the project
        
Preparing and managing budgets including cost estimating and negotiating purchases
        
Responsible for subcontract management, developingscope of work, contract bidding and administration
        
Working in conjunction with the interiordesigner and realtor to determine marketing strategies

Project Member, Skanska Inc, Mar 2011 May2011 (Masters Project)
        Brainstormed with the sub-contractor and performedroot cause and effect analysis  toidentify the bottlenecks of various construction activities
        
Recorded andanalyzed the work process and gave suggestions on improving productivity

Project Member, Skanska Inc, Sep 2010 Nov2010 (Masters Project)
        Analyzed workexecution process and identified improvement
opportunities
        
Prepared reportcontaining analysis of current execution process and recommendation forimprovements

Graduate Research & Teaching Assistant, North Carolina State University, Aug 2010 Dec 2011
        Researched on Durability of Pavement MarkingTapes as a part of Masters Research Project
        
Developed, fabricated and tested pavementmarking tape specimens in the laboratory to determine tape characteristics likebevelled edges, surface texture, tear strength and reinforced characteristics
        
Conducted shear tests on marking tapespecimens with the main focus being on the maintenance factor
        
Taught Construction Materials (Asphalt &Concrete)Lab, Engineering Mechanics and Mechanics of Solids

Associate Project Engineer, SarthakDevelopers, July 2009 Dec 2009
        Monitored cost estimates,documented and reported variances in budgets
        
Assisted in material estimation andrealized accurate material deliveries
        
Updated the current lead time byminimizing the job site inefficiencies/waste 
        
Documented all supplier errors toinclude back orders, quality problems and delivery delays

Trainee Engineer (Intern), ESSAR ConstructionJan 2009 June 2009
        Analysed structural design and made sure thatthe structural work is in accordance with the design
        
Learned testing of construction materials andquality inspection on site
        
Ensured compliance with all safety buildingregulations 
        
Assisted the contractor in drafting reports topresent in company meetings

CERTIFICATIONS
Engineering In Training (EIT),
OSHA - 30 hour training certified for Construction Industry,
Certified Concrete Field Technician Grade I by ACI & NCDOT,
CPR - First Aid

Related keyword:

Join Built.com and Create Your profile, It's Free