Facebook icons twitter icon Register | Login

Career Networking for the Built Environment
Resumes | Employers | Jobs | Answers

 

 

Details of mridul kanti chowdhury


mridul kanti chowdhury

sr mechanical engineer/project engineer

mississauga, United States
Industry Category: Design Build Firms- EPC
Relocation Preferences: na
Highly analytical senior mechanical engineer/principal engineer/project engineer/manager about 20 (twenty) years extensive experience in HVAC, Piping, Plumbing (including health care facilities medical gases, medical/compressed air and vacuum system) and Fire protection engineering consultancy, construction, management and supervision on different projects
Use strong analysis skills and HVAC, Piping, Plumbing and Fire protection system design experience to reduce energy consumption in buildings through optimization of systems
Excellent knowledge of design and calculation, project management construction administration, supervision, technical writing (specification, tender document, bidding & proposal, submittal, scope of work etc), recognition of project criteria, prioritization of completing deadlines, creation of milestones, delegation of tasks, effective use of resources, attention to detail, sustainable building design (accessible/secure/healthy/productive/cost effective), designing new facility, designing major renovations and retrofitting existing buildings to include sustainability to reduce operation costs and environmental impacts, and increasing building resiliency, energy auditing and energy analysis, report preparation and technical coordination, controls, system commissioning, supervision, quality control, cost analysis, review of MEP/FP systems, equipment/systems and material selection, BOQ, budget cost estimation, schedule & estimation, inspection, installation, TAB, noise & vibration control, BMS/BAS system, new construction and renovation projects of various sizes
Experience related to process piping P&ID, specifying mechanical equipment, such as pumps, valves, relief valves etc. Ability to perform calculations to size piping systems, determine fluid flow and perform pressure drop calculations, piping system installation etc
Managing and leading the mechanical department and using professional skills to motivate technical professionals in order to achieve a high level of performance
Excellent record of problem solving, maximizing resources, strong management, organizational development skills and initiated engineering judgement in the execution of responsibilities
Expertise in hotels, hospitals, educational facilities, laboratories, control rooms, data centers, electronics, multi- storied buildings, commercial & housing complexes, shopping malls & supermarkets, churches, pharmaceuticals, industrial, petrochemical projects, sub stations, power plant, refinery, gas plant, oil & gas piping projects etc
Extensive experience with various codes & standards such as ASHRAE, NFPA, UPC, IPC, UMC, SMACNA, NEBB, ASME, AMCA, ASTM, ANSI, AHRI, AWWA, UL, FM, NRC, NBC, OBC, ABC, BC Building code, natural gas propane code & other International, North American Codes/Standards & Safety Codes/Standards
Working knowledge of MS Project, MS Office, Auto Cad, Micro Station, Solid Works, Revit MEP 2012, Timberline, Auto plant 3D
Bachelor's Degree in Mechanical Engineering

mridul kanti chowdhury'S Overview

Resume:

         Highly analytical senior mechanical engineer/principal engineer/project engineer/manager about 20 (twenty) years extensive experience in HVAC, Piping, Plumbing (including health care facilities medical gases, medical/compressed air and vacuum system) and Fire protection engineering consultancy, construction, management and supervision on different projects


         Use strong analysis skills and HVAC, Piping, Plumbing and Fire protection system design experience to reduce energy consumption in buildings through optimization of systems


         Excellent knowledge of design and calculation, project management construction administration, supervision, technical writing (specification, tender document, bidding & proposal, submittal, scope of work etc), recognition of project criteria, prioritization of completing deadlines, creation of milestones, delegation of tasks, effective use of resources, attention to detail, sustainable building design (accessible/secure/healthy/productive/cost effective), designing new facility, designing major renovations and retrofitting existing buildings to include sustainability to reduce operation costs and environmental impacts, and increasing building resiliency, energy auditing and energy analysis, report preparation and technical coordination, controls, system commissioning, supervision, quality control, cost analysis, review of MEP/FP systems, equipment/systems and material selection, BOQ, budget cost estimation, schedule & estimation, inspection, installation, TAB, noise & vibration control, BMS/BAS system, new construction and renovation projects of various sizes


         Experience related to process piping P&ID, specifying mechanical equipment, such as pumps, valves, relief valves etc. Ability to perform calculations to size piping systems, determine fluid flow and perform pressure drop calculations, piping system installation etc  


         Managing and leading the mechanical department and using professional skills to motivate technical professionals in order to achieve a high level of performance


         Excellent record of problem solving, maximizing resources, strong management, organizational development skills and initiated engineering judgement in the execution of responsibilities


         Expertise in hotels, hospitals, educational facilities, laboratories, control rooms, data centers, electronics, multi- storied buildings, commercial & housing complexes, shopping malls & supermarkets, churches, pharmaceuticals, industrial, petrochemical projects, sub stations, power plant, refinery, gas plant, oil & gas piping projects etc


         Extensive experience with various codes & standards such as ASHRAE, NFPA, UPC, IPC, UMC, SMACNA, NEBB, ASME, AMCA, ASTM, ANSI, AHRI, AWWA, UL, FM, NRC, NBC, OBC, ABC, BC Building code, natural gas propane code & other International, North American Codes/Standards & Safety Codes/Standards


         Working knowledge of MS Project, MS Office, Auto Cad, Micro Station, Solid Works, Revit MEP 2012, Timberline, Auto plant 3D


         Bachelor's Degree in Mechanical Engineering


 


PROFESSIONAL QUALIFICATION         


 


         Professional Licensure ON CANADA


         Member, ASHRAE


SPECIALTIES                    


 


            Proficient in  HVAC computer software (Elite, Carrier HAP, E20, Block Load, Trane etc)


Piping, Fire protection and Plumbing software programs


 


 


 


 


EMPLOYMENT HISTORY AND SKILLS & EXPERIENCE


 


 


Millennium Intl. Engineering Ltd. ON CANADA                            2007-Present


Project Engineer/Sr Mechanical Engineer


 


Engineering Activities with List of Projects -


 


            Responsible for HVAC, Plumbing, Fire protection design of different buildings and HVAC/controls/mechanical engineering team, review, RFI responses, supervision, solving problems and preparing site instruction, composition of written narrative with project criteria and basis of design, designing new facility, designing major renovations and retrofitting existing buildings to include sustainability to reduce operation costs and environmental impacts, and increasing building resiliency, energy auditing and energy analysis, field survey, development of systems, engineering and economic data, preparation of detailed construction documents, meetings with contractor/client, coordination of activities with other disciplines, outside agencies and client


            Technical writing, recognition of project criteria, prioritization of completing deadlines, creation of milestones, delegation of tasks, effective use of resources, attention to detail. Preparing chilled water, tower water, glycol, heating hot water, plant steam, plant condensate, hydronic piping systems, ductwork and air distribution, air flow and instrumentation diagrams, load calculation, equipment and material evaluation and selection, detailed energy studies and economic analysis.


            Designed/calculated complete HVAC, Plumbing, Fire protection system by following all applicable standards and HAP software applications for load calculation and energy analysis and finalized preliminary schematic drawings & final schematic drawings


            Psychrometric analysis for review of humidification and dehumidification requirements within the building during winter and summer respectively


            Duct design, piping design, system selection and report, BOQ preparation. Calculated pump head and sized pumps and duct work using standards, pressure loss calculation


            Design included perimeter fan-coil units/heat pumps and window interlocks; dedicated VAV, hydronic outside air unit with energy recovery to provide minimum outside air to fan coil units and high occupancy spaces; and VAV hydronic recirculation air handling unit with minimum outside air to serve interior spaces. Design also included controls for setback and unoccupied override and control of outside air based on CO2 level and space temperature


            Designed 100% outside air handling systems, constant air volume terminal boxes, exhaust system, boilers, chillers, central chilled water/hot water plant (primary/secondary pumping), floor by floor VAV air handling units, smoke exhaust system and stairwell pressurization.


            The selection of equipments of different ranges and systems (split, roof top package, chilled water etc). Selected control valves, balancing valves and other hydronic control devices


            Provided engineering, design and construction administrative services for the development, preparation and issuance of conceptual design documents, schematic design dcuments, design development documents, construction bid documents & shop drawing review documents


            Reviewed HVAC design report designed on a large scale. Provided material and labor analysis


            Prepared preliminary conceptual document and final design engineering document


            Compiled and documented concise record of all technical data, calculations and equipment selections. Participated in design of many nation wide projects


            Managed department, work force and increased productivity by establishing new project report format


            Handled multiple responsibilities with proven competence by supervising many projects at a time


            Demonstrated ability to adapt to changing priorities in design and contract, deadlines and heavy workload. Managed dept in unionized work force while competently handling all responsibilities


            Ensured that all personnel in the section are appropriately trained for the tasks delegated to them and have appropriate qualifications and authorization


            Provided day-to-day coordination across sections within the dept and monitored performance


 


 


 


 


 


 


Some of the major Projects completed successfully are as follows:


 


                                    Tollendale Village Nursing Home, Barrie, ON, CANADA


                                    Hilton Garden Inn (15 storey five star 224 room Hotel), Toronto Intl Airport, CANADA


                                    Residence Inn Marriott, MUSKOKA WHARF HOTEL, Gravenhurst, ON, CANADA


(bedrooms, studio, swimming pool, meeting room, staging, breakfast, exercise, laundry etc.)


            Holiday Inn Express Hotel & Suites 124 room five storey Hotel, Hwy 7/427, Vaughan, ON


                                    Hampton Inn & Suites six storey, Moncton, NB, CANADA


                                    Laurier Brantford University Project, Brantford, ON, CANADA


                                    HGI Airport Project, Hamilton, ON, CANADA


                                    The Waterford-Kingston Retirement Residence, 471 Cataraqui Woods Drive, Kingston, ON


                                    Park wood Mennonite Home, Assisted/Un-Assisted Living Building, Waterloo


            AMICA AT NEW MARKET, Gorham Street (Includes Business Centre, internet, staff, pool, workshop, storage, laundry, stage, theatre, chapel, professional clinic, chess area, salon, library, lounge, dining, fitness centre, education centre, office, bed rooms, living rooms etc.)


                                    SWISS CHALET, HARVEY, KELSEY, MONTANA Projects all over Canada


                                    FORTINOS Super Mall/Shopping centre, Plains Road, Burlington, ON, CANADA


            St. Andrew's Church, Brantford, ON, CANADA


 


 


Engineers Office (Rulers Office), DUBAI, UAE.                                     2004-2007


Project Manager/Sr Mechanical Engineer


 


Engineering Activities with List of Projects -


 


            Responsible for management and staffing of mechanical and plumbing depts, project management, engineering design HVAC, Plumbing, Fire protection projects, quality control, performance reviews and education of junior engineers and designers. Provided peer discussions with experienced engineers and maintaining existing clients and growing new clients through maintaining design requirements. Interfaced directly with clients in defining scope of work, fees and project design criteria. Managing, scheduling and coordination of designers, engineers and draftsmen between mechanical, electrical and plumbing disciplines. Developed construction documents and mechanical job specifications.


               Provided day-to-day coordination across sections within the dept and monitored performance


            Planned, prioritized and organized work for different projects to meet objectives


            Demonstrated ability to adapt to changing priorities in design and contract, deadlines and heavy workload


            Handled multiple responsibilities with proven competence by supervising many projects at a time


            Calculated HVAC, Plumbing and Fire protection systems by following all applicable standards and finalized preliminary schematic drawings and final schematic drawings, duct design, piping design, system selection, report and BOQ preparation, pump head and sized pumps and duct work using standards, psychrometric analysis


         Prepared chilled water, tower water, hydronic piping systems, ductwork and air distribution, air flow and instrumentation diagrams, load calculation, equipment and material evaluation and selection, hydronic control devices, selection of different cooling, heating and ventilation systems based on design calculation and priority to client opinion


            Review, RFI responses, supervision, problem solving and site instruction preparation, overall responsibility for team, composition of written narrative with project criteria and basis of design, field survey, development of systems, engineering and economic data, preparation of detailed construction documents, meetings with contractor/client, coordination of activities with other disciplines, outside agencies and client


 


Some of the major Projects completed successfully are as follows:


 


            Al-Qafaa Island development works all the facilities, Dubai, UAE


 


 


 


 


                        Dubai Marina High rise Apartment building, Dubai, UAE


                        Sk. Maktoum Palace, Dubai, UAE


                        Sk. Hamdan Palace, Dubai, UAE


                        Sk. Rashid Palace, Dubai, UAE


                        Jabil Palace Herbal Clinic, Dubai, UAE


                        Dubai International Airport extension project                                                       


 


 


SOFCON, Saudi Arabia                                                                               1990-2004


Principal Engineer


 


Engineering Activities with List of Projects -


 


            Supervised in-house CAD designers and engineers


            Exercised good record of problem solving by coordinating with other disciplines


            Provided day-to-day coordination across sections within the dept and monitored performance


            Planned, prioritized and organized work for different projects to meet objectives


            Demonstrated ability to adapt to changing priorities in design & contract, deadlines & heavy workload


            Handled multiple responsibilities with proven competence by supervising many projects at a time


            Related keyword:

hvac, plumbing, piping, fire protection

Join Built.com and Create Your profile, It's Free